Quality Electrical Design - On Time - Guaranteed

Case Studies

Power Solutions have assisted our clients with thousands of designs over the years. The following are a few of our recent highlights:

Newcastle Supercars 500 Track Construction
  • Supercars NewcastleDesign for replacement of Ausgrid lighting with Newcastle City Council LED Smart Poles with associated electrical & fibre reticulation
  • Asset relocation for road re-construction and race overlay clearance
  • Simultaneous designs & construction occurring in 5 separate zones to achieve very tight deadlines
Northern Beaches Hospital RMS Road Reconstruction
  • Asset relocations and upgrading including LV, 11kV & 33kV overhead & underground distribution & transmission lines
  • Earthing design & risk assessment
  • Road lighting upgrades
  • Services coordination in congested footways & roadways
  • Navigating issues with nonexistent or obsolete Ausgrid network materials & constructions
  • Compliance with Ausgrid design requirements for new relocated assets exceeding existing in situ assets
  • Coordination with design team to achieve electrical design certification across six work packages in record time
Stockland Greenhills Project – Chamber Substations & Asset Relocation
  • stockland-greenhillsElevated chamber substation with dry type transformers
  • Constrained access for cables and personnel
  • Very tight design timeframes for second chamber substation
  • 3D modelling for services coordination
  • Street lighting upgrades
  • Relocation of 33kV Transmission Line
  • Asset relocations to coordinate with new Ausgrid Zone substation feeders
Newcastle University Newspace Building – Chamber Substation
  • Spatial requirements imposed layout restrictions on substation
  • Architectural constrains presented challenges to incorporate transformer handling area, personnel access and fire exclusion zones into the design
  • Raised chamber floor level due to flooding issues
Lake Macquarie Transport Interchange
  • Major roadworks on RMS main road requiring staged design and construction for asset relocations to maintain traffic flows
  • Combination of Ausgrid and private street lighting
  • Design for relocations of NSW Trains 66kV & 11kV transmission lines
The Beaches – Catherine Hill Bay Residential Subdivision
  • 11kV Master Planning & Feasibility
  • Kiosk substation designs
  • LV reticulation and coordination with planned services
  • Decorative Street Lighting to AS1158
  • Negotiation of servicing strategy for private sewer system

Huntlee Town Centre – Katherine’s Landing
  • 11kV Master Planning
  • Upstream Augmentation of Overhead Line for increased load
  • 5 x Kiosk substation designs
  • Multi staged HV and LV reticulation and coordination with planned services
  • RMS Intersection Lighting & Internal Street Lighting to AS1158